Product Description Barley, wheat, maize, corn, grass seed coating machinery
Introduction 5BY-5A Seed Treater
The 5BY-5A Seed Coating machinery is used for coating vegetable seed and grain seed, such as seeds of wheat, barley, maize, sorghum, soybeans, cotton, chili, grass, etc.
Principle of 5BY-5A Seed Treater
Seeds will be quantitatively fed into the rotary cylinder through feeding bucket elevator, at the same time quantitative medicine will be atomized by air compressor and LDed to the surface of seeds, and then will well mixed in the rolling cylinder.
The seeds will be coated with chemical before sowing, for against the different pest and diseases, lead to better germination.
Features of 5BY-5A Seed Treater
-Good air-tightness
-Overload and overheat protection
-Quantitative medicine supply system
Techinical data
Model
|
Capacity(T/H)
|
Power(KW)
|
Weight(KG)
|
Dimension L×W×H(mm)
|
Agent Supply Model
|
5BY-2
|
2
|
1.47
|
200
|
1600×800×1500
|
LDoon
|
5BY-5A
|
5
|
6
|
800
|
2200×900×2500
|
LDoon
|
5BY-5B
|
5
|
2.3
|
700
|
2150×800×2400
|
Dosing Pump
|
Photos
Related productsIf there are a lot of stones in your material, you can choose:
For better seed cleaning,you may want:
After cleaning,you may want bagging scale system:
To remove the bad seeds,you need gravity separator:
Our best selling round bean separator:
We can also provide complete line:
Pack Details
After-sales Service
Company Information
FAQ1. Q Are you factory or trading company?
A We are professional manufacturer for seed processing and also a international trading company
2. Q What is your minimum order quantity?
A 1 Set
3. Q What are your payment terms for new customers?
A T/T, L/C, Money Gram, West Union, Paypal etc
4. Q How long will it take for my products to arrive me?
A Usually by sea, 20 LDs to 50 LDs depend on which country you are in.
5. Q How can I visit your factory?
A1. From Guang Baiyun International Airport to LD international airport (2.5hours) , then to our factory by car (1hour)
A2. From Jinan West Railway Station to LD Railway Station by High-speedtrain(1.5 hours), then to our factory by car (45minutes)
A3. From Hongkong International airport to LD international airport (4.5hours), then to our factory by car (1hour)
Personal information