China supplier industrial potato chips microwavebake machinery
Microwavebake amchine:
Microwavebake machinery is using microwave Enerable to make the products' inside and outside heating at the same time.It is easy to get a right temperature to make thebake best.Because microwave Enerable can penetrate the products,so the heating time is very fast.And microwavebake machinery can save LDout 50% Enerable than other bakihng machinery.
Advantages of microwave oven:
1.Tunnel continuous conveyor microwave drying oven,work continuous;
2.fast drying ,can finish drying in 3~5 minutes;
3 while drying,also have sterilization function;
4 easy to control,2~3workers can operate it;
5 cover less area;
6 high quality with CE,304# stainless steel material.
Reference of machinery details:
Main parameters:
Model |
Rated input power(KVA) |
Microwave output power(KW) |
Expected dehydration(kg/h) |
Expected sterilization Capacity(kg/h) |
Dimension
L*W*H(mm)
|
JN-12 |
18kw |
12kw |
12~17 |
150~20 |
7200*820*1750 |
JN-15 |
21kw |
15kw |
15~21 |
200~250 |
8300*820*1750 |
JN-18 |
26KW |
18KW |
18~22 |
230~280 |
8300*820*1750 |
JN-20 |
28kw |
20kw |
20~28 |
280~350 |
9550*820*1750 |
JN-25 |
36kw |
25kw |
25~35 |
350~400 |
9550*820*1750 |
JN-30 |
42kw |
30kw |
30~42 |
400~480 |
10680*840*1750 |
JN-35 |
49KW |
35KW |
35~45 |
480~550 |
10680*840*1750 |
JN-40 |
56kw |
40kw |
40~48 |
550~650 |
10680*1440*1750 |
JN-45 |
63KW |
45KW |
45~52 |
600~700 |
11810*1440*1750 |
JN-50 |
70kw |
50kw |
50~60 |
700~800 |
11810*1440*1750 |
JN-60 |
84kw |
60kw |
60~84 |
850~1000 |
12940*1440*1750 |
JN-70 |
98kw |
70kw |
70~~98 |
1000~1100 |
14070*1440*1750 |
JN-75 |
105kw |
75kw |
75~105 |
1100~1200 |
15200*1440*1750 |
JN-80 |
112kw |
80kw |
80~112 |
1200~1400 |
15200*1600*1750 |
JN-100 |
140kw |
100kw |
100~140 |
1400~1600 |
15200*1660*1750 |
JN-120 |
kw |
120kw |
120~ |
1600~2000 |
17460*1660*1750 |
JN-150 |
210kw |
150kw |
150~210 |
2000~2500 |
20850*1750*1750 |
NOTE: We can specially desity the equipment according to your products’ features. |
Pack and Shipping
1. very Term:FOB/CFR/CIF
2. very time:28 work LDs after having received payment
3. Package:wooden cases(fully meets with export package requirements)
4. Payment Terms:50% deposit by T/T,balance 50% paid by T/T before shipment.
5.TranLDortion:By vessel
NOTE:We can specially desity the machinery according to your production's features.
Jinan Joysun Machinery Co., Ltd..