Product Description
wheat seed, corn seed, vegetable seed treating machinery
Features
seed treater seed coating machinery is controlled by the dosing pump, it can adjust the quantity and the percentage of medicine : seed, so it is easy operate, and it can clean itself automatically.
Application
seed treater seed coating machinery is a good choice for coating seed. It applies for various crops, such as seed of wheat, barley, maize, sorghum, soybeans, cotton, vegetables, fruits etc.
worldPrinciple
Seeds can be continuous fed into inlet through feeding bucket, at the same time quantitative medicine will be atomized by the high speed centrifugal rotary disk and adhere to the surface of seeds, then the seeds will be compley mixed by the soft auger in the stainless steel cylinder.
High speed centrifugal rotary disk (for atomizing the medicine) and large stainless steel cylinder (for mixing by auger rolling), can have a good coating effect.
LLDe |
Capacity (t/h) |
Power (kw) |
Weight (kg) |
Dimension (mm) |
Agent Supply Model |
5BY-2 |
2 |
1.47 |
200 |
1600× 800× 1500 |
LDoon |
5BY-5A |
5 |
6 |
800 |
2200× 900× 2500 |
LDoon |
5BY-5B |
5 |
2.3 |
700 |
2150 × 800× 2400 |
Dosing Pump |
Photos
Related productsIf there are a lot of stones in your material, you can choose:
For better seed cleaning,you may want:
After cleaning,you may want bagging scale system:
To remove the bad seeds,you need gravity separator:
Use bean polishing machinery to make beans smooth,shiny and pearly!
Pack Details
After-sales Service
Company Information
FAQ1. Q Are you factory or trading company?
A We are professional manufacturer for seed processing and also a international trading company
2. Q What is your minimum order quantity?
A 1 Set
3. Q What are your payment terms for new customers?
A T/T, L/C, Money Gram, West Union, Paypal etc
4. Q How long will it take for my products to arrive me?
A Usually by sea, 20 LDs to 50 LDs depend on which country you are in.
5. Q How can I visit your factory?
A1. From Guang Baiyun International Airport to LD international airport (2.5hours) , then to our factory by car (1hour)
A2. From Jinan West Railway Station to LD Railway Station by High-speedtrain(1.5 hours), then to our factory by car (45minutes)
A3. From Hongkong International airport to LD international airport (4.5hours), then to our factory by car (1hour)
Personal information